Assess
Title, feasibility, land and machinery valuation, manpower plan and transformation estimate.
Re-engineer
Existing machinery is modified, PLC automation added, lines reorganised and the team trained.
Optimise
Logistics are aligned, the plant is connected to raw material and buyers, and output is tracked daily.
The two revivals
| Pochampally | Jeedimetla | |
|---|---|---|
| Condition when taken on | Distressed and closed | Working, at a loss |
| Site | 8.2 acres, with about 50,000 sq ft of buildings | 4 acres |
| Capacity | 25 to 60 tonnes a day | 30 to 100 tonnes a day |
| Time to turn around | About 6 months | About 4 months |
| Year | 2017 | 2018 |
Company-stated figures. A typical turnaround takes six to eight months. Costs are not published.
For plant owners
If you own an under-used paper or converting plant, talk to us. Read the assessment questions.